Scaffolder

Your ideal partner for scaffolding construction: a GEDA scaffolding lift

Scaffolders are scaffolding specialists and it is their work that forms the basis for all subsequent work steps on any construction project, be it a new build, renovation or refurbishment. Speed, safety and efficiency are essential when it comes to scaffolding. This means the experts are frequently faced with demanding challenges as regards complex architecture, large surface areas, high assembly heights, special projects such as platforms and usually also under time pressure.
Therefore it is not without reason that scaffolders have for decades relied on a GEDA construction hoist as a handy helper for those tough daily routines on a construction site.

The appropriate scaffolding lift for every construction site situation

A GEDA scaffolding lift is the ideal partner for scaffolders who need to build scaffolding quickly and safely. It not only ensures that all scaffolding elements – from scaffolding tubes to floors – can be transported but that all the relevant tools can be moved upwards to where they are needed. Ease of use, fast assembly and unparalleled quality and durability Made in Germany make the GEDA scaffolding lifts stand out.

Depending on their intended use and the specific construction site conditions, scaffolders have the choice in the extensive GEDA product range between compact wire rope lifts, pure material lifts through to practical transportation platforms which can all be used as scaffolding lifts. The range of different load capacities and wide variety of load carrying devices and platform variants means they are flexible to use and make daily life on building sites easier.
Whereas wire rope lifts are ideally suited for the assembly of smaller scaffolds, pure material lifts such as the GEDA 200 Z, construction hoist are designed for higher load capacities and are ideally suited for work with larger scaffolding constructions. GEDA transport platforms have the benefit of two separate control systems and can be used both as a pure construction hoist and also as a transport platform for people and (scaffolding) materials.
Nor are cramped space conditions a problem for the handy helpers.

Primarily in the small unit segment, a range of practical load carrying devices and perfectly adapted accessories ensure that work is both flexible and efficient.
The GEDA Mini/Maxi range of wire rope lifts also includes a practical transportation frame. The scaffolding lift is fixed safely with a quick locking mechanism and can be mounted directly onto the scaffold within the transportation frame. The robust undercarriage is suitable for every foundation.

A GEDA scaffolding lift protects your health and your wallet

Precisely in an age when a more human approach is becoming a higher priority on construction sites, employees’ health aspects, must be taken fully into account alongside time and cost savings. Laborious, time-consuming and energy-sapping manual scaffolding construction not infrequently has a negative impact on health, with illness-induced absence due to back pain unfortunately all too common.
Using a GEDA scaffolding lift makes building scaffolding considerably easier, ensures building site efficiency and protects the health of employees.

 

 

Our product range for scaffolders:

 
ma_star_200_standard , ma_star_250_comfort , ma_mini_60_s , ma_maxi_120_s , ma_maxi_150_s , ma_200_z , ma_300_z , ma_300_zzp , ma_500_zzp , ma_1200_zzp , ma_1500_zzp , ma_multilift_p18, ma_bauschuttrutsche_standard, ma_bauschuttrutsche_comfort
Know-how in use