Tunneling

GEDA lifting solutions for tunnel construction

Cramped space conditions, inclinations and arches present big challenges to height access technology when it comes to tunnel construction. GEDA lift solutions have been designed in such a way that they can also defy adverse environmental conditions and ensure reliable, efficient and above all safe access to road, rail and underground tunnels.

GEDA solutions for tunnel construction are perfectly adapted to the requirements of the tunnel construction sector and can also be permanently installed in tunnels. In addition to a big range of standard devices with load capacities from 300 kg to 7,5 t, customised solutions based on specific customer requirements are also designed. A wide range of car sizes, hoisting speeds of up to 60 m/min and even stainless steel designs are available so that the devices can be adapted perfectly to all on-site conditions. And depending on need and the deployment site, GEDA industrial elevator solutions are naturally equipped with explosion protection.

GEDA products also comply with general industrial specifications and can also be certified in accordance with ANSI A17.1 and EN-81. The entire company has also been tested according to the ISO 9001:2008 quality standard and certified in the environmental management system and occupational health and safety areas.

GEDA lift solutions are also at the forefront of new tunnel construction projects. With its extensive range of temporary construction hoists, the experts support tunnel construction projects throughout the world.

Integrated project support approach

GEDA understands the importance of being close to its customers. Therefore in order to be in a position to serve our customers in accordance with market requirements on a global basis, for decades we have been investing in sites both in Germany and across the world and in a comprehensive dealer and service network. Throughout the entire project– and also after its completion – GEDA supports its customers as a skilled and reliable partner. The GEDA service-orientation starts with the delivery of the device when the service teams support customers with tailor-made training which can also include the assembly and commissioning of the device on-site. Global maintenance contracts for all GEDA device types, as well as a quick replacement parts and repair service, are an integral aspect of the GEDA service provision.

 

 

Our product range for tunneling:

 
ma_multilift_p12,ma_ph_2032,ma_ph_2737,ma_ph_3240,ma_sh,ma_300_z_boiler_hoist
Know-how in use: