New product launch - presented at BAUMA 2007
The new GEDA 200 Z – the universal hoist for scaffolders and construction workers.
| Most often, there are economical reasons for using construction hoists. You can spare your materials and save money. Of course, they offer increased safety for people and materials. Quite a lot of companies also use construction hoists to build up a second pillar with renting the machines. Often the architects' service specifications also demand material hoists. There are a lot of reasons for using construction hoists. GEDA is able to offer a wide range of multi-purpose units for height access technology. |
|
| On this year's BAUMA you will be presented a new member of the GEDA family; the small, lightweight and handy GEDA 200 Z – our ideal hoist for scaffolders and construction workers. |
|
![]() |
![]() |
| Technical Data: | |
| Load bearing capacity 200 kg | The lightweight platform (only 44kg) can |
| Lifting speed 25 m/min | be turned by 90° to the left and to the right. |
| Platform 1.4 x 0.8 x 1.1 m | |
| Lifting height 35 m | |
| The mast with the toothed rack can be fixed to the scaffold using only one tube. The anchoring distances are 4m. The entire unit only requires an area of 1.5 x 1.5 m on the ground, which makes it possible to load the hoist parallel to the building without any problems. Unloading at the landing levels can be easily done by turning the platform. |
|
| The GEDA design and development team has constructed the GEDA 200 Z to be easily serviced and maintained, i.e. easy access to handy components. |
|
| The GEDA 200 Z has been designed and constructed with respect to the demands and desires of a lot of customers. It can be used in the following areas |
|
|
|

